Bluebeam Revu + Primavera P6 Professional Training and Workshop
Integrated Construction Planning
This course is suited for construction professionals involved in project planning, scheduling, and coordination—particularly quantity surveyors, planners, schedulers, estimators, project engineers, and project managers.
Whether you’re working on residential, commercial, or infrastructure projects, this training equips you with practical skills in digital takeoff using Bluebeam Revu and comprehensive scheduling with Primavera P6. It’s designed to help you streamline construction workflows, improve project accuracy, and make data-driven decisions from pre-construction to execution.
JULY 28-31, 2025
6PM to 10PM (16 hours)
LIVE ONLINE (MS Teams)
Early bird and Group Package promo is until July 21, 2025 only.
left to register! Hurry up!
Course Description
This 16-hour hands-on training and workshop is designed to bridge the gap between quantity takeoff and construction scheduling using two powerful tools: Bluebeam Revu and Primavera P6. Through a structured four-day program, participants will learn how to efficiently extract quantities from construction drawings using Bluebeam, translate them into Excel, and seamlessly integrate the data into Primavera P6 for project scheduling. The course focuses on a real-world workflow tailored for planners, quantity surveyors, engineers, and project managers aiming to optimize construction planning through accurate quantity takeoff, cost estimation, and activity scheduling.
Course Objectives
The course aims to equip participants with the technical knowledge and practical skills to perform precise quantity takeoff using Bluebeam Revu and develop effective construction schedules using Primavera P6, enabling integrated planning, cost loading, and project control. By the end of this course, participants will be able to:
- Navigate the Bluebeam Revu interface and apply core tools for digital measurement and markup.
- Perform quantity takeoff for various construction elements such as slabs, walls, and windows.
- Organize and summarize measurement data using custom columns, legends, and markups.
- Export quantity takeoff data from Bluebeam to Excel for further processing.
- Translate QTO data into project durations and work breakdown structures in Primavera P6.
- Create a comprehensive project schedule using logical relationships and productivity-based durations.
- Assign and manage resources (labor, equipment, materials) in Primavera based on the quantities taken off.
- Optimize the project timeline and resource usage and generate scheduling and cost reports for project planning and billing purposes.
- Demonstrate end-to-end integration from construction drawings to reports using Bluebeam, Excel, and Primavera P6.
Entry Competencies
Participants are expected to have a basic understanding of construction project workflows, including familiarity with building elements and typical construction processes. Prior experience in interpreting construction drawings and using Excel is recommended, as these skills will facilitate the measurement and scheduling exercises. While no prior knowledge of Bluebeam Revu or Primavera P6 is required, participants should be comfortable with using computers and navigating software tools, as the training involves hands-on activities, software interfacing, and real-world simulations. This course is ideal for quantity surveyors, planners, engineers, and construction professionals seeking to enhance their planning accuracy and project control capabilities.
Prerequisites
No Prerequisites.
Technical Requirements
1) desktop/laptop computer (with mouse for ease of control)
2) stable internet connection
3) headset (for better listening) – optional
4) webcam – optional
Minimum desktop/laptop hardware requirements:
– Intel® Core™ i3 or AMD equivalent
– 4GB RAM
– 128GB SSD or HDD
– Windows 11 / 10 / 8.1 / 8 OS (64-bit system, x64 based processor)
COURSE OUTLINE
INTRODUCTION – (0.25 HOURS)
- OVERVIEW OF THE WORKFLOW: BLUEBEAM > EXCEL > PRIMAVERA
- INTRODUCTION TO THE SAMPLE PROJECT (E.G., 2-STORY COMMERCIAL BUILDING)
BLUEBEAM INTERFACE & TOOLS – (0.75 HOURS)
- INTRODUCE PANELS, TOOL CHEST, MARKUPS LIST
- CALIBRATION AND MEASUREMENT UNITS
- LAYERS AND VIEWPORTS
DRAWING SETUP- (0.50 HOURS)
- CALIBRATE SCALE FROM DRAWINGS
- ORGANIZE DRAWINGS USING LAYERS AND BOOKMARKS
- CREATE VIEWPORTS FOR DIFFERENT AREAS (E.G., GROUND FLOOR, 2ND FLOOR)
BASIC TAKEOFF TOOLS – (1.00 HOUR)
- AREA, LENGTH, COUNT, VOLUME
- USE OF SNAP TO CONTENT VS SNAP TO MARKUP
- CUSTOMIZING MEASUREMENT TOOLS
HANDS-ON EXERCISE – (1.25 HOURS)
- CALIBRATE AND TAKE OFF: SLABS, WALLS, AND WINDOWS
- RECORD MARKUPS WITH LABELS (E.G., “200MM RC SLAB”)
- START USING CUSTOM COLUMNS (MATERIAL, PHASE)
Q&A + HOMEWORK – (0.25 HOURS)
- ASSIGNMENT: TAKE OFF BEAMS, COLUMNS, AND FINISHES
- SAVE BLUEBEAM FILE FOR DAY 2
REVIEW AND CONTINUATION – (0.50 HOURS)
- RECAP OF DAY 1
- REVIEW HOMEWORK TAKEOFFS
ADVANCED TAKEOFF TOOLS – (0.75 HOURS)
- USING THE TOOL CHEST EFFECTIVELY (E.G., “CONCRETE TOOLS,” “MASONRY TOOLS”)
- CUSTOM COLUMNS FOR PHASE, UNIT COST, ETC.
- CREATING DYNAMIC LEGENDS
ORGANIZING AND SUMMARIZING DATA – (0.75 HOURS)
- FILTER BY PAGE, LAYER, SUBJECT, LABEL
- USING THE MARKUPS LIST TO GROUP AND SORT
- USING SPACES TO TAG ZONES (E.G., ZONE A, GROUND FLOOR)
QTO REPORT GENERATION – (0.75 HOURS)
- SUMMARIZE QUANTITIES BY TRADE
- EXPORTING TO EXCEL
- FORMATTING EXCEL SHEET FOR USE IN PRIMAVERA (E.G., WBS COLUMN, ACTIVITY NAME, QUANTITY, DURATION ESTIMATION NOTES)
INTEGRATION TALK: FROM QTO TO PLANNING – (0.75 HOURS)
- HOW QTO AFFECTS SCHEDULE LOGIC AND RESOURCES
- PREVIEW OF HOW QUANTITIES WILL BECOME DURATIONS/RESOURCES IN PRIMAVERA
- WALKTHROUGH OF SAMPLE EXCEL-TO-PRIMAVERA MAPPING
Q&A + ASSIGNMENT – (0.50 HOURS)
- HOMEWORK: FINALIZE EXCEL QTO TABLE FOR IMPORT
- SAVE FOR USE IN DAY 3 PRIMAVERA SESSION
PRIMAVERA INTERFACE AND SETUP – (0.50 HOURS)
- CREATING A NEW PROJECT
- CALENDARS AND PROJECT DEFAULTS
- IMPORTING OR REFERENCING EXCEL QTO
CREATING WORK BREAKDOWN STRUCTURE – (0.75 HOURS)
- ALIGN WBS WITH BLUEBEAM CATEGORIES (E.G., SITEWORKS, STRUCTURAL, FINISHES)
- TIPS ON NAMING CONSISTENCY AND HIERARCHY
ACTIVITY CREATION – (0.75 HOURS)
- CREATING ACTIVITIES UNDER EACH WBS LEVEL
- NAMING ACTIVITIES BASED ON QTO SCOPE (E.G., “CAST GROUND FLOOR SLAB – 200M²”)
ESTIMATING DURATIONS FROM QTO – (1.00 HOUR)
- PRODUCTIVITY RATE DISCUSSION (E.G., 10M²/DAY FOR SLAB CASTING)
- USE EXCEL QTO TO COMPUTE DURATIONS
- INPUT DURATIONS AND LOGIC IN PRIMAVERA
HANDS-ON SCHEDULING – (0.75 HOURS)
- LINK ACTIVITIES USING FS, SS, FF LOGIC
- GROUPING ACTIVITIES BY PHASE AND TRADE
- CHECK PRELIMINARY CRITICAL PATH
Q&A + HOMEWORK- (0.25 HOURS)
- ASSIGNMENT: COMPLETE LINKING OF ALL MAJOR ACTIVITIES
REVIEW & LINKING CHECK – (0.50 HOURS)
- REVIEW CRITICAL PATH AND LOGIC ERRORS
- CONFIRM DURATIONS VS QTO
RESOURCE DICTIONARY AND ASSIGNMENTS- (0.75 HOURS)
- CREATE LABOR, EQUIPMENT, AND MATERIAL RESOURCES
- ASSIGN BASED ON QTO (E.G., 5 LABORERS/DAY FOR 10M² SLAB)
RESOURCE AND COST LOADING – (1.00 HOUR)
- ASSIGN RESOURCES TO KEY ACTIVITIES
- INPUT MATERIAL QUANTITIES FROM BLUEBEAM
- COST CALCULATION (UNIT COST X QTO FROM EXCEL)
SCHEDULE OPTIMIZATION – (0.75 HOURS)
- ANALYZE RESOURCE USAGE
- ADJUST LOGIC OR SEQUENCES TO OPTIMIZE TIMELINE
- CREATE BASELINE AND GENERATE REPORTS
WRAP-UP DISCUSSION AND DEMO – (0.50 HOURS)
- SHOW COMPLETED WORKFLOW: DRAWING > QTO > EXCEL > SCHEDULE > REPORTS
- REAL-WORLD APPLICATIONS: BIDDING, PLANNING, BILLING
OPEN FORUM / Q&A – (0.50 HOURS)